Technical

Data & test results

Independent test data and documentation for KOVON architectural film. All figures are drawn from third-party testing; full reports are available to specifiers on request.

Reaction to fire

B — s1, d0

BS EN 13501-1:2018

KOVON Grain — Performance Grain

B-s1,d0 is among the strongest reaction-to-fire classifications applied to architectural interior films — very low flame spread, the lowest smoke class, and no flaming droplets.

Tested by SGS — HOKLAS-accredited laboratory (Reg. No. 229)

EN 13501-1 test results

Every measured parameter is within the Class B / s1 / d0 limits.

ParameterResultRequirement
FIGRA 0.2MJ18.5 W/s≤ 120 W/s
FIGRA 0.4MJ18.5 W/s≤ 120 W/s
THR 600s0.4 MJ≤ 7.5 MJ
SMOGRA (smoke)1.9 m²/s²≤ 30 m²/s² — s1
TSP 600s (smoke)38.7 m²≤ 50 m² — s1
Lateral flame spreadNone to edgeMust not reach edge
Flaming droplets / particlesNoned0
Ignitability — Fs (EN ISO 11925-2)≤ 150 mm / 60 sPass

Result applies to the tested build-up: 0.2 mm film (240 g/m²) self-adhered to a 10 mm A2 calcium silicate board, without joints. Valid for all A1/A2 substrates. The official SGS classification report (No. SDFTS26003552R01) was issued in July 2026 and is available to specifiers on request.

Material data

Properties & test data

Confirmed material properties and independent test results for the KOVON film.

CategoryStatusNotes
MaterialConfirmedPVC architectural decorative film, self-adhesive
Film thicknessConfirmed0.15–0.60 mm by design (excl. liner)
Area densityConfirmed240 g/m²
Substrate compatibilityConfirmedMDF · plywood · wood · stainless steel · aluminium · glass · painted surfaces
Installation temperatureConfirmedRecommended 18–25°C · working range 12–35°C
ApplicationConfirmedSelf-adhesive, seamless — suitable for flat and curved profiles
Adhesion (ISO 29862)ConfirmedStrong, professional-grade bond — independently tested
Abrasion resistance (ISO 9352, Taber CS-17)ConfirmedWithstands in excess of 4,500 cycles (Taber CS-17, 1,000 g, ISO 9352) — engineered for high-traffic interiors
Roll sizeConfirmed1.22 m × 50 m, all series
Shelf lifeConfirmed2 years from production date; store below 38 °C, upright, away from sunlight and moisture
EN 16516 VOC emissionsIn ProgressTesting in progress — data available on request as results confirm

Application

Installation & handling

A summary of the KOVON installation guide and technical notes. The full illustrated guide is included in the product catalogue and available on request.

Installation guide

  1. Application scope

    Designed for interior surfaces, installed by trained professionals.

  2. Installation environment

    Install at 18–25°C on a completely dry substrate, in a clean, dust-free area.

  3. Substrate requirements

    Clean, smooth, stable surfaces — MDF, plywood, wood, metal, glass, painted surfaces.

  4. Surface preparation

    Sand, fill uneven areas, clean with alcohol, and dry fully before application.

  5. Primer treatment

    Apply 2–3 coats to cut edges, porous substrates, corners, and joints.

  6. Installation method

    Apply from the centre outward with a felt squeegee; use heat for curves, avoid overstretching.

  7. Joint & pattern

    Keep a consistent direction and batch; pre-check pattern alignment before installing.

Precautions & technical notes

  • Moisture & humidity

    Avoid moisture-prone substrates; seal edges properly in wet areas.

  • High temperature

    Avoid continuous heat above 50°C and direct sunlight.

  • Substrate limitations

    Not for uneven, unstable, or moving substrates — the base must be firmly fixed.

  • Inspection & batch control

    Inspect before installation; avoid mixing batches on the same surface.

  • Embossed / textured films

    Textured films need stronger pressure for full adhesion in recessed areas.

  • Mock-up first

    Always conduct a mock-up test before full installation.

Recommended tools
Felt squeegeeCutterHeat gun (optional)RollerMeasuring tapeCleaning cloth
This is a summary — the full illustrated installation guide with technical notes is available on request.

Installation should be carried out by trained professionals. Product performance may vary depending on substrate and site conditions — always conduct a mock-up test before full installation.

Compliance

Certification status

We report certification status transparently. Where a standard is still in progress, we say so — and provide the underlying test data on request.

Completed Testing
  • EN 13501-1 reaction to fire — Class B-s1,d0 (Performance Grain system, SGS report issued July 2026)
  • Strong, professional-grade adhesion (ISO 29862)
  • Abrasion resistant — withstands in excess of 4,500 cycles (ISO 9352, Taber CS-17, 1,000 g load)
In Progress
  • EN 16516 VOC emissions testing
Available Upon Request
  • EN 13501-1 reaction-to-fire test data (Performance Grain)
  • Adhesion test report (ISO 29862)
  • Abrasion test report (ISO 9352)
  • Material safety data sheets (MSDS / SDS)
  • Substrate preparation & application guidelines

Documentation

Documents

Technical documentation is provided on request. Tap a document below to request it via WhatsApp.

KOVON Product Brochure (KOVON-BRO-2026-R1)

Full overview of the five KOVON series — Essence, Grain, Mineral, Atelier, and Metal — with colours and finishes.

Technical Data Sheet — General (KOVON-TDS-2026-R1)

Material specification, substrate compatibility, application guidance, and confirmed test data.

Technical Data Sheet — Performance Grain Fire-Rated System (KOVON-TDS-PG-2026-R1)

Reaction-to-fire classification (SGS, HOKLAS-accredited) for the Class B-s1,d0 result, including substrate scope. Official classification report No. SDFTS26003552R01 available on request.

Test Performance Summary (KOVON-TSR-2026-R1)

Independent test results for the KOVON film — adhesion (ISO 29862), abrasion resistance (ISO 9352), and reaction to fire (EN 13501-1).

Installation Guide (KOVON-ING-2026-R1)

Full illustrated installation guide and technical notes — surface preparation, primer, application method, joints, handling, and recommended tools.

Sample Request

Request physical swatch samples for specification and client presentation.

Test results relate to the configurations and substrates stated and may not apply to other build-ups. Always confirm project-specific compliance with a qualified fire engineer or specifier. Tectara Materials Limited is a materials supplier; installation is the responsibility of the appointed contractor.